SUMMARY
The Project Transaction Transfer (PA.PTT.00) screen duplicates items in the grid for as many times as the system finds batches in the batch table with the same batch number as the Project Transaction Transfer batch.
DETAILS
Open Project Controller Setup (PA.SET.00). Change the Last Charge Entry Batch Number to a higher range than the batches already in the batch table.
Views:
Keywords: Project, paptt, duplicate