Views:

Resolution  - Edit the length of Project ID and Task ID in Project Controller Flexible Key Maintenance (PA.FKM).

CORRECTION STEPS:
1. Go to Flexible Key Maintenance (PA.FKM).
2. Select either PROJECT or TASK in the Field Type.
3. Edit the Field Length as desired.
4. Save the changes